站内搜索
|
详细信息 Product Name: SIM Immersion Burner Gas Burner, Oil Burner Industrial Gas Burner for Furnace Model NO.: SIM 001 Brand: Weish Structure: Customized Certification: Patent Certificate Type: Environmental Protection Heating Trademark: WEISH Transport Package: Customized Origin: Guangzhou China Product Description Guangzhou WEISHEnvironmental Protection Technology Co., Ltd. specializes in energy conservation and environmental protection, helping enterprises to achieve low-carbon economy. Weish Weixu environmental protection Co., Ltd. provides R & D and technical consultation for energy conservation and environmental protection projects, possesses the national patent technology of gold hoop combustion rod, has more than 10 years of project heating experience in the field of surface combustion technology, and provides new environmental protection building materials and soft film fireproof decorative materials. Weish Weixu environmental protection is committed to the promotion and application of various well-known brands of combustion equipment, gas equipment, environmental protection building materials and industrial technology products in all walks of life with the service concept of "integrity, professionalism, innovation and leadership".Characteristic1. High rate - using low-pressure input gas, its combustion power reaches about 25000 kW / M20 (2150 x 104 kcal / hr. M2).2. High efficiency The structure of the burner and the use of high wind pressure turbine fan provide good combustibility and high heating efficiency.3. Save space The burner can obtain larger combustion power and its integrated structure, which makes the heating equipment of immersed tube compact and saves installation space.4. Easy maintenance The maintenance and maintenance of the burner can be carried out easily.5. Widely used The product range of this series is 116 kw-465 kW. (10 x 104 kcal/hr to 40 x 104 kcal/hr) work(Informationrequired) 1. Tank --- steel plate t3.2; non-lagging l.5 ×1×2.5 (m) 2. Liquid --- water; the depth of the water 0.7 (m) 3. Temperature - 65oC (start temperature lOoC) 4. Load (treating) --- 600 kg/h, steel 5. Treating time - 2.5 hl)How to decide the intake of heat 1.1)Heat requiredin Starting a) Heating liquid1.5 ×o.7 ×2.5 ×1, 000 = 2, 625 kg ←weight of liquid [2625×(65-10)]/2.5= 57, 750 kcal/h b) Loss of evaporating 3.75 m2×2, 821 kcal/( m2/h)= 10, 580 kcal/h c) Loss ofthe tank 11.8 m2×488 kcal/( m2/h) = 5, 760 kcal/h d) Consumed by the steel tank11.8 m2×25.12 kg/m2 ×0.2 kcal/( kg) ×55oC = 3, 260 kcal/hra)~d)total requirement 77,350 kcal/h 1.2) Heat required in heating a) Loss of evaporating--- 10,580 kcal/h b) Loss fromthe tank - 5r760 kcal/h c) Load --- 600 kg/h ×0.2 kcal/( kg /oC ) ×55oC = 6, 600 kcal/h a)-c) Total requirement is 22,940 kcal/h Required heat per hour is 77,350 kcal/hr (select the bigger one between them)2) Assumption of the efficiency To be set to60%3) How to decide the power 77, 350÷0.6 = 128, 920 kcal/h→ (150 kW)(in the conclusion: burner is SIM-200k, tube size is IOOA)4) How to size the square of thetransmission of heatRefer to figure 1 150 kW÷58.2 kw/m2=2.58m2(Tube sizes: dia, IOOA; length 7.2m)
|